*Portions of this clip experienced audio distortion* Opening of Meeting with Roll Call
*Portions of this clip experienced audio distortion* Hearings on Certificates of Appropriateness: - Introduction of Hearings and Rules of Procedure - Swearing-In of Speakers - Summary of the Hearing Process
Applications: 613 Broad St. – to include nearly complete removal of existing landscaping and replacement with landscaping according to the submitted plan for the Primary, Secondary, and Tertiary AVCs. The plan includes installation of one or more gas street lights and new wood fencing.
100 E. Front St. – to include replacing the destroyed stage with a new stage using a new design in a new location.
715 E Front St. – to revise the approved CoA for this project to allow for elevating the interior of the house while the exterior walls remain, extra wall height is added to the top of the walls, the window and door thresholds, sills, jambs, and headers are modified, and the roof structure and chimney are removed and replaced. This is an after-the-fact application.
520 New St. – to include replacement of a chain link fence with a wood fence and brick pier to match the existing adjacent fencing in the Primary AVC.
518 Metcalf St. – to include replacement of existing 1-story rear addition with 1-story construction and replacing the kitchen window with a new doorway and a brick stoop in the Secondary and Tertiary AVCs.
618 Craven St. - to include on all AVCs: raising the structure on a new, brick, masonry foundation; new, brick, masonry steps; new, painted, wood post and railing at the landing; new, painted, ornamental, metal railing and pickets on the steps toward Craven Street; new, painted, wood steps, railing, and pickets at the side entry.
712 New St. - to include a new front porch railing in the Primary AVC to match existing front stair railing.
Continue Meeting to May 21, 2020
Re-Opening of Meeting with Roll Call
Hearings on Certificates of Appropriateness: - Introduction of Hearings and Rules of Procedure - Swearing-In of Speakers - Summary of the Hearing Process
Applications: 516 Metcalf St. – to include removing the fixed window blinds in the Primary AVC.
Re-Opening of Meeting with Roll Call
229 E. Front St. - to include replacing the tile balcony flooring with composite deck boards (Trex).
215 E. Front St. - to include covering the wood fascia with a metal fascia in the Primary, Secondary, and Tertiary AVCs.
717 E. Front St. - to include: new landscaping in the Primary, Secondary, and Tertiary AVCs; a brick patio, wooden garden beds, bench in the Tertiary AVC; and 6-foot high perimeter privacy fencing in the Secondary and Tertiary AVCs.
404 Avenue A - to include: replacing the square pressure treated wood columns and caps with new round wooden columns, caps, and bases; replacing the metal pre-hung front door with a wood door with an upper glass panel and a wood screen door; and new porch railing; all in the Primary AVC.
Consideration of Issuing COAs for Applications Approved on May 20, 2020
HPC Administrator’s Report A. Report on Application for CLG grant funding from the State HPO - to conduct a preservation plan/building study for the King Solomon Lodge. B. Other Items and Updates
Demolition By Neglect Committee Updates A. Report by Committee
8. New Business A. Future Changes to the Guidelines 10. Adjourn
*Portions of this clip experienced audio distortion* Opening of Meeting with Roll Call
*Portions of this clip experienced audio distortion* Hearings on Certificates of Appropriateness: - Introduction of Hearings and Rules of Procedure - Swearing-In of Speakers - Summary of the Hearing Process
Applications: 613 Broad St. – to include nearly complete removal of existing landscaping and replacement with landscaping according to the submitted plan for the Primary, Secondary, and Tertiary AVCs. The plan includes installation of one or more gas street lights and new wood fencing.
100 E. Front St. – to include replacing the destroyed stage with a new stage using a new design in a new location.
715 E Front St. – to revise the approved CoA for this project to allow for elevating the interior of the house while the exterior walls remain, extra wall height is added to the top of the walls, the window and door thresholds, sills, jambs, and headers are modified, and the roof structure and chimney are removed and replaced. This is an after-the-fact application.
520 New St. – to include replacement of a chain link fence with a wood fence and brick pier to match the existing adjacent fencing in the Primary AVC.
518 Metcalf St. – to include replacement of existing 1-story rear addition with 1-story construction and replacing the kitchen window with a new doorway and a brick stoop in the Secondary and Tertiary AVCs.
618 Craven St. - to include on all AVCs: raising the structure on a new, brick, masonry foundation; new, brick, masonry steps; new, painted, wood post and railing at the landing; new, painted, ornamental, metal railing and pickets on the steps toward Craven Street; new, painted, wood steps, railing, and pickets at the side entry.
712 New St. - to include a new front porch railing in the Primary AVC to match existing front stair railing.
Continue Meeting to May 21, 2020
Re-Opening of Meeting with Roll Call
Hearings on Certificates of Appropriateness: - Introduction of Hearings and Rules of Procedure - Swearing-In of Speakers - Summary of the Hearing Process
Applications: 516 Metcalf St. – to include removing the fixed window blinds in the Primary AVC.
Re-Opening of Meeting with Roll Call
229 E. Front St. - to include replacing the tile balcony flooring with composite deck boards (Trex).
215 E. Front St. - to include covering the wood fascia with a metal fascia in the Primary, Secondary, and Tertiary AVCs.
717 E. Front St. - to include: new landscaping in the Primary, Secondary, and Tertiary AVCs; a brick patio, wooden garden beds, bench in the Tertiary AVC; and 6-foot high perimeter privacy fencing in the Secondary and Tertiary AVCs.
404 Avenue A - to include: replacing the square pressure treated wood columns and caps with new round wooden columns, caps, and bases; replacing the metal pre-hung front door with a wood door with an upper glass panel and a wood screen door; and new porch railing; all in the Primary AVC.
Consideration of Issuing COAs for Applications Approved on May 20, 2020
HPC Administrator’s Report A. Report on Application for CLG grant funding from the State HPO - to conduct a preservation plan/building study for the King Solomon Lodge. B. Other Items and Updates
Demolition By Neglect Committee Updates A. Report by Committee
8. New Business A. Future Changes to the Guidelines 10. Adjourn