Opening of Meeting with Roll Call
Approval of Minutes of Previous Meeting(s)
Hearings on Certificates of Appropriateness: Hearings: Introduction, Swearing-In, Summary of Process - Introduction of Hearings and Rules of Procedure - Swearing-In of Speakers - Summary of the Hearing Process
215 Craven St. – to include the installation of a storefront storm protection system in the Primary AVC.
311 Bern St. – to include the installation of new, wood window blinds and new, wood, 4- foot-high fencing in the Primary AVC.
227 Middle St. – to include a second-floor addition in the Tertiary AVC.
Old Business (non-hearing items tabled or continued from a previous meeting): Awards Work Group – discussion of award categories and examples
New Business: Appoint representative to Resiliency Plan stakeholder meeting
Training Opportunity - National Alliance of Preservation Commissions – Community Assistance and Mentoring Program modules on Community Resilience and Disaster Planning
7. HPC Administrator’s Report A. Report on CoAs Issued since the Workday before the Prior Regular Meeting Agenda was posted until the Workday before this Agenda Was Posted (1/11/21 - 2/09/21) MAJORS: 415 S. Front St. – Blackbeard’s revisions 808 E. Front St. - amend approved design 309 Bern St. – rear addition and screened porch MINORS: 520 E. Front St. – shed size revision (CoA revision) and rear steps railing (Minor) 208 Metcalf St. – front steps handrails B. Report on CoA Extensions Issued since the Prior Regular Meeting: 421 E. Front St. (Farmers Market) – Extension until January 22, 2022, of the CoA approved January 22, 2020 – new replacement garage doors. C. Other Items and Updates State Statute 160 D - update 9. Adjourn
Opening of Meeting with Roll Call
Approval of Minutes of Previous Meeting(s)
Hearings on Certificates of Appropriateness: Hearings: Introduction, Swearing-In, Summary of Process - Introduction of Hearings and Rules of Procedure - Swearing-In of Speakers - Summary of the Hearing Process
215 Craven St. – to include the installation of a storefront storm protection system in the Primary AVC.
311 Bern St. – to include the installation of new, wood window blinds and new, wood, 4- foot-high fencing in the Primary AVC.
227 Middle St. – to include a second-floor addition in the Tertiary AVC.
Old Business (non-hearing items tabled or continued from a previous meeting): Awards Work Group – discussion of award categories and examples
New Business: Appoint representative to Resiliency Plan stakeholder meeting
Training Opportunity - National Alliance of Preservation Commissions – Community Assistance and Mentoring Program modules on Community Resilience and Disaster Planning
7. HPC Administrator’s Report A. Report on CoAs Issued since the Workday before the Prior Regular Meeting Agenda was posted until the Workday before this Agenda Was Posted (1/11/21 - 2/09/21) MAJORS: 415 S. Front St. – Blackbeard’s revisions 808 E. Front St. - amend approved design 309 Bern St. – rear addition and screened porch MINORS: 520 E. Front St. – shed size revision (CoA revision) and rear steps railing (Minor) 208 Metcalf St. – front steps handrails B. Report on CoA Extensions Issued since the Prior Regular Meeting: 421 E. Front St. (Farmers Market) – Extension until January 22, 2022, of the CoA approved January 22, 2020 – new replacement garage doors. C. Other Items and Updates State Statute 160 D - update 9. Adjourn