Link

Social

Embed

Disable autoplay on embedded content?

Download

Download
Download Transcript


[00:00:01]

GOOD EVENING, EVERYONE.

[1. Roll Call]

WELCOME TO THE APRIL 5TH MEETING.

UH, THE THING, IS THERE ANY MORE FOR THE CITY OF NEWBURGH? CAN I GET ROLL ON BLACK? SO CLICK HERE, HERE, AND SHOUT MARGIE, DON MARCUS SIMMONS, PAT DARIAN.

HERE YOU HAVE A CAR.

UH, FIRST, FIRST, UH, FIRST ITEM ON THE

[2.A. Weyerhaeuser Real Estate Development Company are requesting subdivision general plan approval for “West New Bern Ph. 2” a proposed 140-lot Planned Unit Development. This subdivision is located on a combined 41.10+/- acres in the R-6 Residential District. The site is located to the north of US HWY 70 and to the east of NC 43.]

AGENDA ITEM.

HEY, WE'RE HAVING A REAL ESTATE DEVELOPMENT COMPANY OR REQUESTING SUBDIVISION DIVISION OF GENERAL PLAN RULE OR WEST NEWBURN PHASE TWO.

THEY PROPOSED 140 LOCK PLANNED UNIT DEVELOPMENT.

THIS SUBDIVISION IS LOCATED ON A COMBINED 41.10 ACRES IN THE RCX RESIDENTIAL DISTRICT.

THE SITE IS LOCATED TO THE NORTH OF USI ONE 70 AND EAST, NC 43.

AND WE'LL GET A STAFF REVIEW SALVAGE, WHOEVER SOME OF THIS AGAIN, APPLICANT'S WAREHOUSE REAL ESTATE DEVELOPMENT COMPANY.

WEST PHASE TWO ARE 6 41 POINT ACRES, 140 ROCKS, MAYBE ALMOST 7,000 LINEAR FEET OF PROPOSED STREET.

CITY OF UTILITY STAFF MAP HERE UPDATED MAPS ABOUT WAREHOUSES IS GOING TO BE THE PROPERTY HERE IS TRACK THE WEST DEMON FACED.

HE WENT BEFORE THE CITY OF NEWBORN DEPARTMENTAL REVIEW COMMITTEE ON DECEMBER 10TH, 2021 PROVISION OF LEGAL REQUIREMENTS FOR DENTAL SUBDIVISION PLAN APPROVAL HAVE BEEN SATISFIED ACCORDING TO THE LAND USE ORDINANCE.

THEREFORE STAFF RECOMMENDS APPROVAL OF A GENERAL, UH, AT THIS TIME, IS ANYBODY HERE REPRESENTING WEYERHAEUSER REAL ESTATE DEVELOPMENT THAT WOULD LIKE TO TALK TO THE BOARD? SURE.

ALL RIGHT, COME ON.

THAT'S GETTING NEWS CHAIRING THE BOARD.

MY NAME IS SCOTT ANDERSON.

I'M WITH ART CONSULTING GROUP.

AND HERE TONIGHT ON BEHALF OF THE APPLICANT, WEYERHAEUSER, APPRECIATE THE OPPORTUNITY TO PRESENT THIS PLAN TO YOU.

UM, AS SETH MENTIONED, THIS IS A 140 SINGLE FAMILY RESIDENTIAL LOTS.

UM, WITH THE MINIMUM LOT SIZE IS 6,000 SQUARE FEET.

AN AVERAGE LOT SIZE IS ABOUT 6,700 SQUARE FEET, UM, PROPOSING, UM, ALMOST 7,000 LINEAR FEET OF NEW ROADWAYS.

UM, THE NEW ROADWAYS ARE 26 FOOT BACK TO BACK IN A 61 FOOT RIGHT OF WAY.

UM, WITH SIDEWALKS ON BOTH SIDES OF THE STREETS, THE LAYOUT BE VERY SIMILAR TO WHAT WAS CONSTRUCTED IN PHASE ONE.

UM, JUST ON THE NORTH SIDE OF THE CHILD'S DRIVE.

UM, JUST UP FROM THIS, UM, THERE IS A 20 FOOT, UM, PERIMETER BUFFER.

THAT'LL BE LEFT ALONG THE NORTH AND THE EAST OF THE PROPERTY ADJACENT TO THE NEIGHBORING PROPERTY.

UM, AND AS THAT MENTIONED, WATER, SANITARY, SEWER AND ELECTRIC ARE ALL PROVIDED BY THE CITY OF NEWBURGH AND STORM WATER MANAGEMENT IS PROVIDED ON THE SITE TO ME, BOTH THE STATE AND THE CITY OF NEWBORNS, UH, STORMWATER MANAGEMENT REQUIRED.

I'LL BE HAPPY TO ANSWER ANY QUESTIONS THAT YOU HAVE.

SO ALL OF THE, UH, ITEMS FROM THE APARTMENT OR REVIEW HAVE BEEN RESOLVED, IS THAT CORRECT? YES, SIR.

OKAY, EXCELLENT.

UH, THE INFRASTRUCTURE WILL BE CONSTRUCTED AS A PART OF THIS PROJECT IS THERE SUPPLY WATER AND I JUST WASN'T SURE IF THAT WAS OVER I ALREADY TOLD YOU THEY'RE ALREADY ON-SITE AS IT WERE SO YEAH, I THINK YOUR QUESTION SUDDENLY IS WHO DOES THE WORK? SO CONTRACTOR DEVELOPER COMPLETES THE WORK AND THEN WHICH IS EXPECTED BY THE CITY,

[00:05:01]

ULTIMATELY ACCEPTED BY THE CITY, RIGHT UP TO CITY STANDARDS, FURTHER QUESTIONS OR COMMENTS FROM THE BOARD.

OKAY.

AT THIS TIME, IS THERE ANYBODY FROM THE PUBLIC WHO WOULD LIKE TO COME UP AND DISCUSS THIS DEVELOPMENT? DO I HAVE SOMEONE WHO WOULD LIKE TO MAKE A MOTION TO APPROVE THE WAREHOUSE OR REAL ESTATE? THE GOLDMANS AND THE 140 WATTS WHEN A UNIT DEVELOPMENTS ON ITEM EIGHT? YEAH.

I'D LIKE TO MAKE A MOTION.

WE APPROVE THE GENERAL, UM, SUBDIVISION PLAN FOR WEST CLEVELAND, UH, PHASE 240 LOT PLAN DEVELOPMENT AS ALL RIGHT.

I HAVE A MOTION AND A SECOND YES, SIR.

YES, YES, YES.

WHY AREN'T YOU DONE? YES, YES, YES.

MOTION PASSES.

NEXT ITEM,

[2.B. Weyerhaeuser NR Company (c/o McKim & Creed) are requesting general subdivision plan approval for “Thales Academy at West New Bern”. This section of the multi-phase development is located on approximately 8.86 +/- acres in the C-3 Commercial District. The site is located to the north of US HWY 70.]

ITEM B UH, WAREHOUSING OUR COMPANY BEING REPRESENTED BY HIM AND KIM AND CRE OR WHAT'S IN GENERAL SUBDIVISION PLAN APPROVAL FOR SALES ACADEMY AT WEST NEWBURN.

THIS SECTION OF THE MULTI-PHASE DEVELOPMENT IS LOCATED ON APPROXIMATELY 8.86 ACRES IN THE C3 COMMERCIAL DISTRICT.

THE SITE IS LOCATED TO THE NORTH OF US HIGHWAY 70, AND WE GET A STAFF ON THAT.

YES, SIR.

AND CAN ON THIS ONE LOT, 205 FEET OF LINEAR STREETS ARE PROPOSED AGAINST CITY OF NEW ENGLAND UTILITIES.

WE'RE GOING TO GO BACK TO THE SAME SITE DAILIES ACADEMY ON THE EXISTING PARK ROAD.

THERE'LL BE AN EXTENSION HERE FOR FUTURE PART OF THE PROJECT.

THEY ALWAYS ACADEMY OF QUESTIONING BEFORE THE VRC ON FEBRUARY 25TH, 2022 STAFF REVIEWED THE ABOUT TECHNICAL AND LEGAL REQUIREMENTS FOR GENERAL SUBDIVISION PLAN APPROVAL AND SATISFIED.

ACCORDING TO THE CITY OF ME BY MIRANDA USE THE ORDINANCE FOR GENERAL SUFFICIENT PLANNING APPROVAL.

A FAILURE ACADEMY WAS RECOMMENDED AT THE DRC.

THERE WEREN'T ANY COMMENTS ON ABSOLUTELY ONE.

THE FIRST ONE, THEY FIRST PRESENTED THIS WAY, WAY BACK SEVERAL YEARS AGO, I ASKED WHO WAS GOING TO BUILD THE SCHOOL.

NOW I KNOW, UM, AT THIS POINT IN TIME, UH, THERE'S ANYBODY REPRESENTING MCKINNON CREEK ON ADDRESS THE BOARD? SURE.

THE THING I'M TIRED OF, OR IF YOU LOOK MECHANIC CRUELTY, UM, I AM HERE ON BEHALF OF WAREHOUSE OR I'M THE PROJECT MANAGER I'M JOINED BY CLIFF PARSONS ATTORNEY WITH GORDON SMITH AND KELLY HAWKINS.

WHO'S ALSO, YOU CAN CREATE A SPECIAL COORDINATOR.

UM, WE CONTINUE TO BE EXCITED ABOUT THE WEST NEWBURGH COMMUNITY AND COMMON DEPARTMENTS ARE UP AND BEING LEASED.

AND DR.

HORTON IS DOING THEIR SINGLE FAMILY HOMES.

SO I THINK THAT WE'RE REALLY GAINING SOME MOMENTUM AND WE CERTAINLY HAVE APPRECIATED ALL OF STAFF'S HELP TO GET US TO THIS POINT AS WELL.

THE PIECE FOR FAILURE, UM, IS BASICALLY JUST CARVING OUT THAT EIGHT PARCEL FROM WHICH THE ACADEMY IS GOING TO, UM, IS IN THE PROCESS OF DEVELOPING THEIR SITE-SPECIFIC PLAN FOR THE SCHOOL.

UM, SO, UM, THIS REQUEST JUST CARVES OUT THE PROPERTY.

WE CERTAINLY WOULD APPRECIATE YOUR CONTINUED SUPPORT OF THE WESTERN DEVELOPMENT.

AND WE ARE HERE TO ANSWER ANY QUESTIONS YOU MAY HAVE.

AT WHAT POINT DO YOU THINK YOU WOULD START CONSTRUCTION? UM, I CAN, UM, WE ARE JUST, WE'RE NOT REPRESENTING THE BAILEY'S ACADEMY, BUT CERTAINLY I CAN DIRECT YOU TO THE RIGHT PEOPLE THAT COULD ANSWER SCHEDULE QUESTIONS OR ANYTHING SITE-SPECIFIC LIKE THAT.

AGAIN, I, I CAN, I CAN SPEAK FOR WEYERHAEUSER TO CARVE OUT THIS PROPERTY, BUT ANY OF THE SPECIFICS ASSOCIATED WITH THE SCHOOL, I CAN JUST, LIKE I SAID, WE CAN GET YOU THE CONTACT INFORMATION.

WELL, PAT AND MYSELF IN REAL ESTATE WEEK, IT'S GOOD TO KNOW.

IT REALLY WILL BE A BENEFIT TO THE WHOLE COMMUNITY FOR SURE.

[00:10:01]

QUESTIONS.

THANK YOU.

MA'AM AT THIS POINT, ARE THERE ANY, ANYBODY FROM THE PUBLIC COMMENT ON THIS PROPOSED DEVELOPMENT? OKAY.

SO ITEM B, I'M LOOKING TO POSSIBLY HEAR A MOTION TO APPROVE THE GENERAL SUBDIVISION PLAN ROOF OR THE BAYLISS ACADEMY AT WEST NEWBURN.

SO YEAH, SO I THINK THIS IS A RECOMMENDATION TO THE BOARD BALDWIN TO APPROVE, I THINK SO CORRECT FOR SOUTHERN VISUAL THING FOR WHAT IS IT NOT FOR ME? JUST MAKING SURE THAT WE KNEW WHAT WE WERE APPROVING TOO, IF THAT IS JUST FOR THE DIVISION.

OKAY.

ALRIGHT.

PERFECT.

ALLOWS WITH US THEN THIS POINT I HAVE A MOTION AND A SECOND SET.

THEN I GOT A ROLL CALL.

YES, YES.

MARGIE DOWN.

YES, YES, YES.

MOTION PASSES.

GOOD.

THE SECOND.

ALL RIGHT.

UM, LET'S MOVE ON

[2.C. McKim & Creed are requesting subdivision general plan approval for “Chambray at Carolina Colours” a proposed 27-lot major subdivision. This development is located on a combined 21.06 +/- acres in the R-8 Residential District. The site is located to the west of US HWY 70.]

TO ITEM C.

ALSO MCKENNON CREED ARE REQUESTING SOUTHERN DIVISION GENERAL PLAN APPROVAL FOR CHAMBER A AT FARRON COLORS, A PROPOSED 27 LOT MAJOR SUBDIVISION.

THIS DEVELOPMENT IS LOCATED ON A COMBINED 21.06 ACRES.

AND OUR EIGHT RESIDENTIAL DISTRICT BESIDE IS LOCATED TO THE WEST OF US HIGHWAY 17 STEPS WHEN WE GET A STAFF RATE.

YES, SIR.

21.06 ACRES LOOKING AT 27 LOTS.

REMEMBER THREE ACRES OF OPEN SPACE, RATHER A THOUSAND FEET OF LINEAR STREETS PROPOSED NEW BURTON UTILITIES.

THIS, THIS APP ONE, THE COLORS, UH, RESTART ADJACENT 70.

THIS, THE BAYBERRY EXTENSION OF LABOR WILL COME RIGHT INTO THIS CAMBRIDGE BRC ON FEBRUARY 25TH, 2023.

AFTER THE VIEW SUBROGATION FIND ALL THE TECHNICAL AND LEGAL REQUIREMENTS FOR DENTAL SUBDIVISION PLAN APPROVAL AND SATISFIED APPROVAL.

SHANDRA CAROLINE RECOMMENDED DRC COMMENTS FOR THESE ARE VERY, VERY MINOR.

OKAY.

ALL DEMOCRATS DON'T SAY OPEN, ADDRESSED CORRECTLY, GOING TO BE FED WITH THAT NEW.

MAYBE EVENTUALLY.

I DON'T KNOW IF THAT'S, I MEAN, I THINK ALL OF TECHNICAL AND THE TOWN'S GOING TO BE ADDRESSED, IT WILL BE PART OF THAT SYSTEM.

YES, SIR.

DID YOU HAVE ANY MORE NEWS ON WHAT'S GOING ON WITH THAT ORDER? YOU KNOW, AND I DID TALK TO JORDAN EVERYTHING'S ON SCHEDULE AND THEY WEREN'T, THEY WEREN'T CONCERNED ABOUT ANY KIND OF A DEFICIT SPEAK YOU SCHEDULE.

I MEAN, HE'S NEVER HAD A PROBLEM WITH WATER SYSTEM.

THAT'S OF COURSE YOU DON'T LIVE IN PAPER.

PEOPLE WHO LIVE THERE, YOU CAN'T TAKE YOUR SHOWER.

AND I KNOW THAT PART OF THE REASON THAT THAT LINE HAS GONE, JUST WAITING TO FIND OUT WHAT'S GOING ON.

YOU DON'T HAVE ANY OF THAT.

THE LAST TIME I CHECKED BEFORE THE LAST MINUTE, IT'S POSSIBLE WHEN YOU GET TIME.

AND YOU'VE BEEN CHECKING ON THAT FROM TIME TO TIME, IF THERE'S ANY UPDATES.

ABSOLUTELY.

I APPRECIATE YOU THAT, ARE THERE ANY MORE QUESTIONS FROM THE BOARD? ALRIGHT.

THIS ONCE REPRESENTATIVES FROM MCKENNAN CREATE, WANT TO DISCUSS THIS ONE.

[00:15:03]

UH, GOOD EVENING BOARD.

I'VE KEPT PARAGRAPH I'M REPRESENTING, UH, OVERLOOK, CODINGS, WHO IS THE OWNER OF THIS PROPERTY.

AND THIS IS, UH, ONE OF OUR TRADITIONAL LARGER LOT SUBDIVISIONS IN THE REALM OF TODAY'S DEVELOPMENT PROCESSES.

UH, EACH THE AVERAGE LOT IN HERE WILL BE OVER A HALF AN ACRE IN SIZE, AND IT'S GOING TO BE A VERY HEAVILY WOODED SITE, UH, OR EVEN, UH, BECAUSE OF THE TERRAIN OF THE PROPERTY.

WE DON'T EVEN REQUIRE A STORMWATER POND.

WE'RE GOING TO BE ABLE TO DRAIN THE PROPERTY AND GET THE STORM WATER WITH HER NUTS.

SO IT'S GOING TO BE, UH, A VERY, VERY ATTRACTIVE AREA.

AND IF YOU EVER WALKED BACK IN THERE, IT'S REALLY NICE.

WHAT YOU SEE IS THIS IS A BIG BARRIER PHASE THREE THAT DR.

HORTON IS IN THE PROCESS RIGHT NOW OF CLEARING AND DEVELOPING.

AND ONCE THAT HAPPENS, THAT WILL PROVIDE US ACCESS TO BUILD THE ROAD IN TO SHAN BRAY, TO THAT'S KIND OF THE SCHEDULE THAT WE HOPE THAT HAPPENS SOMETIME, UH, THIS SUMMER THAT WE'LL HAVE ACCESS TO THAT PIECE OF PROPERTY TO DO THE DEVELOPMENT WORK.

SO THAT PIECE IS ON THE BACKSIDE OF WHERE THE CLEARCUT LANGUAGE.

YEAH.

WHEN YOU LOOK AT THE CUT NOW, ALL THE WOODS BEHIND IT IS WHAT IS THAT PIECE OF PROPERTY? WHAT YOU HAVE TO DO WHEN YOU DO SMALL LOT DEVELOPMENT ON FLAT LAND, ALL THE LOTS HAVE TO GET CONTOURED IN ORDER TO GET DRAINAGE, TO GO TO THE STREET OR TO DRAINAGE OUTLETS.

AND WITH 60 FOOT WIDE BLOCKS, LEAVING TREES, IT'S HARD TO DO AND NOT MUCH THAT IT'S IMPOSSIBLE TO DO AND STILL CREATE THE DRAINAGE PATTERNS AND RESOURCES THAT YOU NEED TO DO.

THE ORIGINAL, THE ORIGINAL BANG MARRIED WAS THE SAME WAY THAT WAS BACK THERE AT THE PARK WITH MY GRANDCHILDREN.

AND THEY WERE SO UPSET.

THEY'RE NOT THE ONLY ONES THAT WE'VE HEARD FROM ENJOYING THE VIEW OF THE WATER TOWER, UH, THE ONLY WAY IN AND OUT AND GOING THROUGH A BETA.

YES, RIGHT NOW, ULTIMATELY THERE WAS ANOTHER ROAD THAT CONNECTS.

IT WILL LOOK AROUND AND TIE INTO SPRING GREEN PASS.

SO THAT WILL GIVE IT AN ALTERNATE MEANS OF INGRESS AND EGRESS.

AND OUT OF THAT, WHAT, WITH THIS LOT CONFIGURATION OR WILL BE ANOTHER PHASE.

YEAH, THIS WILL BE THE HAND.

THIS GOES ALL THE WAY TO OUR PROPERTY LINE ON THE FAR END OF THE PROPERTY.

AND THEY'LL COME BACK AROUND MINE.

MAYBE THE ENTRANCE WILL BE PART OF THIS EVENTUALLY.

UH, EVENTUALLY IT WOULD'VE BEEN A LOOP AROUND.

THERE'S ANOTHER BLOCK OF LAND IN BETWEEN WHAT, UH, THE, OUR BOARD IS CURRENTLY DOING.

AND THIS LAND UP TO THE NORTHEAST, I WOULD GUESS, UH, THAT HASN'T BEEN DEVELOPED YET.

YOU KNOW, WHERE THE, UH, WHERE IT SPRING GREEN PAST DAN AND HE'S NOW NETBOX KIOSK.

THAT WILL BE AN EXTENSION TO BRING RATE PASS.

WE'LL CONTINUE ON DOWN THERE, TAKE A LEFT AND TIE INTO THIS AND THE WATER TOWER CONNECTION THAT Y'ALL WERE TALKING ABOUT WILL HAPPEN WITH, WITH NO, WITH MAYBERRY AT THIS PART OF THE BAY AREA, THREE PROCESS, UH, NEXT TO THE WATER TOWER INTO THE CITY SYSTEM.

OKAY.

SO THAT'S, AND THAT'S WHAT HAPPENED MUCH FASTER.

ARE YOU SAYING THAT THERE'S FOLKS THAT CAN'T TAKE A SHOWER ALREADY? DAVE.

AARON.

YEP.

ANY OTHER QUESTIONS FROM THE BOARD AT THIS TIME? ARE THERE ANY MEMBERS OF THE PUBLIC WHO WOULD LIKE TO COME UP AND SPEAK ON BEHALF OF ITEM C PROPOSED GENERAL APPROVAL? WHAT WE JUST TALKED ABOUT? HAVING NONE AT THIS TIME.

UM, I WOULD LIKE TO SEE IF THERE IS A POSSIBLE RECOMMENDATION FROM THE BOARD TO APPROVE THE GENERAL PLAN FOR 27 1 MAJOR SUBDIVISION, EXCEPT IT'S WRITTEN.

I HAVE A MOTION AND A SECOND.

IS THAT

[00:20:01]

REAL CALL? YES.

YES.

YEAH.

YES.

[2.D. A. Sydes Construction, Inc., are requesting subdivision final plan approval for “Hutton Pointe Phase One at Bluewater Rise, A Planned Unit Development” a 57-lot residential planned unit development (PUD). This section of the multi-phase development is located on a combined 41.15 +/- acres in the R-8 Residential District. The site is located to the north of County Line Road and to the west of Old Airport Road.]

ITEM ON THE AGENDA.

THIS IS A SIZE CONSTRUCTION OPERATOR REQUESTING SUBDIVISION, FINAL PLAN APPROVAL OR HUNTING POINT PHASE ONE AT BLUEWATER ARRIVED.

THE STATE PLANNING ON THE BELT, 57 LOCK RESIDENTIAL PLAN KNEW THAT THE SESSION OF THE MULTI-PHASE DEVELOPMENT IS LOCATED ON BIND 41.15 ACRES IN THE RA RESIDENTIAL DISTRICT.

WE GET A STAFF REFUND.

THIS STREETS.

I'M SORRY.

BEFORE YOU GO, CAN YOU GO BACK TO THAT FIRST PICTURE? TECHNICAL LEGAL REQUIREMENTS FOR FINAL SUBMISSION UNSATISFIED, SATISFIED PLAN APPROVAL PHASE ONE.

WE DID RECEIVE THE APPROVED BY PUBLIC WORKS.

ARE THERE ANY QUESTIONS FROM THE BOARD? I THOUGHT LAST TIME WE TALKED ABOUT THIS WITH THE WATER, RIGHT? HE WASN'T GOING TO DO ANYTHING ELSE UNTIL THAT WATER WAS ISSUED WAS CLEARED UP.

CAN WE GO, CAN WE GO BACK AND LOOK AT THAT? I DO.

WHAT WAS THAT ABOUT TWO MEETINGS AGO? YEAH.

YES.

I GUESS THE IMPORTANT THING HERE IS THAT THIS IS THE FINAL PLAN APPROVAL.

SO THIS IS FOR SUBDIVISION THAT WE APPROVED SOME TIME AGO.

NOW THE WORK HAS BEEN COMPLETED.

SO THIS IS THE, THIS IS APPROVAL OF THE, UM, THE FILE PLAN.

WE'RE READY TO BE PLANTED IN .

BUT THEN ALSO IT'S IMPORTANT TO REMEMBER THAT THE RULES GOVERNING THE PLANNING AND ZONING BOARD ARE FEARS SPECIFIC ABOUT WHAT YOUR AUTHORITY IS AND WHERE THOSE METES AND BOUNDS INCLUDE.

AND THIS BODY DOES NOT HAVE THE ABILITY TO DECLARE A MORATORIUM ON DEVELOPMENT IN A PARTICULAR AREA IN THE CITY.

THAT'S OUTSIDE OF YOUR PURVIEW TONIGHT, BEFORE YOU AND DETERMINING WHAT YOU'RE GOING TO APPROVE OR DISAPPROVE AS FILE PLAT, YOU ARE TASKED BY LAW TO SET FORTH THE DEFICIENCY WHEREIN THE SPINAL PLAN FAILS TO MEET THE DIFFERENCE OF, SO YOU CAN DETERMINE HOW THIS PARTICULAR PLAN FAILS TO ME.

ONE OF THE REQUIREMENTS WAS LAND USE ORDINANCE, THE ORDINANCES THAT YOU SHALL APPROVE THE PILOT WITH THAT BEING SAID, IS THERE ANYBODY HERE FROM SIDE'S CONSTRUCTION THAT WOULD LIKE TO TALK TO THE BOARD? THOMAS THOMAS, AND WE'RE JUST QUITE FORWARD.

SUBDIVISION OFFERED TO YOU I'LL ANSWER ANY QUESTIONS THAT Y'ALL MAY HAVE.

THE LAST JOHN WAS HERE, WE TALKED ABOUT WATER PRESSURE AND YOU WENT BACK AND CHECKED AND THERE WAS SOMETHING TO DO WITH IT, A VALVE THAT WAS CLOSED OR SOMETHING.

YEAH.

YOU KNOW, IT'S UNFORTUNATE TO HELL THAT CONVERSATION OCCURRED.

UM, AND HONESTLY, WE DIDN'T KNOW THAT UNTIL I CAME TO THIS MEETING.

SO I GOT WITH THE ENGINEERING DEPARTMENT AND ALSO AT THE FARM, WE LOOKED AT SOME OF THE FLOWS THAT THEY WERE DOING AT DIFFERENT LOCATIONS IN THE BLUE WATER SUBDIVISION.

[00:25:02]

AND IT'S PRETTY OBVIOUS WHERE THE PROBLEM WAS.

AND WE POINTED THAT OUT TO THEM.

AND WHAT THEY FOUND IS AN ABRUPT CHANGE FROM ONE SIDE OF THE INTERSECTION, WHATEVER.

AND WE'RE POINTING TO THAT VILE BY ALMOST MINISTERED OR SOMETHING.

AND I SAID, YOU CAN COUNT THE TURNS OUT WHEN YOU CLOSE IT TO DETERMINE THE SIZE.

SO OBVIOUSLY WOULD YOU COUNT THE TIME FOR YOU TO WRITE SONGS? AND SO WE HOPE IT DIDN'T STOP.

AND, AND THAT WAS IT.

SO IT WENT BACK TO THAT VOWEL AND WHAT HAPPENED, WE PUT TWICE FOR WIRES ON TOP OF THE PIPE THAT GOES UP INTO THE FILES SO THAT IT PUT TO IT, SEND A SIGNAL WHERE THE CABLE AT WORK, IT WRAPPED AROUND THE STEM OF THAT VILE.

IT'S GOT DIFFERENT MOVING FAULT.

THEY HAD TO BUY OUT OPEN WHEN THEY ONLY HAD IT LIKE 10, 15%.

SO ONCE THEY GOT THAT CORRECTED THE FLOODS AND THE HYDRUS RETURNED TO WHAT THE MODEL SHUTTERED, UM, WHICH WAS JUST HUNDRED POUNDS OF GAS.

AND THEN AT 900,000 GALLONS A MINUTE, WHICH IS WHAT WE'RE GETTING OUT OF.

MOST OF THE HYDROS OUT THERE, EXCEPT ON THE FRONT END, WE'RE DEALING OR WHATEVER.

SO THAT WAS THAT PROBLEM.

UM, SO AS FAR AS WE KNOW EVERYTHING OUT THERE IS OKAY RIGHT NOW WITH WHAT WERE THE BILL.

UM, AND THE MODEL WAS SHUTTERED IN, IN WHAT WE'RE DOING NOW WITH THE LAST ONE WE BROUGHT IN AND THIS PARTICULAR ONE AS THE FIREPLACE OUT THERE, AS FAR AS, UM, I WOULDN'T MIND COMING IN, UM, I TOLD HER JORDAN MONTH, SO PEOPLE KEEP TELLING ME THAT THE LAST TIME IT SCARES SCARY TO HAVE THAT FLOODED IS PROBABLY THE WORST GUY.

HE'S PROBABLY BURPING 800 GALLONS, A MINUTE PROFILE, WHICH ARE TARGETED FOR VERSION OF A LONG STORY.

SO I APPRECIATE YOU ADDRESSING THAT SPECIFIC ISSUE.

OBVIOUSLY YOU REMEMBER FROM TWO MEETINGS AGO, WE HAD A, WE HAD A DIALOGUE ON THAT BOARD.

SO I APPRECIATE YOU ADDRESSING THAT.

ARE THERE ANY OTHER QUESTIONS FOR THE BOARD AT THIS TIME, SIR, AT THIS TIME, IS THERE ANY MEMBER OF THE PUBLIC WHO WOULD LIKE TO TALK ABOUT THIS POST APPROVAL? ALL RIGHT.

THERE ARE NONE.

ALL RIGHT.

AT THIS TIME, I'D LIKE TO LOOK FOR ANY MOTION TO APPROVE THE FINAL SUBDIVISION PLAN FOR HUTTON POINT PHASE ONE AT BLUE WATER TO RISE.

I'LL MAKE A MOTION THAT WE APPROVE THE FINAL SUBDIVISION PLAN FOR PHASE ONE.

WE WILL ARISE AS FOR A SECOND AND EMOTION IN A SECOND.

AND I GET A ROLL CALL.

YES, YES, YEAH.

YES.

YES.

[2.E. Quality Oil Company, LLC. has requested consideration of an application to rezone one parcel totaling 0.95 +/- acres, from C-4 neighborhood business district to C-3 commercial district. The parcel is located south of US HWY 55, and to the east of S. Glenburnie Rd. The parcel is further identified as Craven County Parcel ID # 8-240- 100.]

E QUALITY OIL COMPANY LLC HAS REQUESTED DURATION OF AN APPLICATION TO REZONE ONE PARCEL TOTALLING 0.95 ACRES FROM SEAFORTH BUSINESS DISTRICT.

YOU SEE THREE COMMERCIAL DISTRICTS.

THE PARCEL IS LOCATED SOUTH OF US.

HIGHWAY 55 SOUTH ROAD.

THE PARCEL IS FURTHER IDENTIFIED AS CRAVING COUNTY PARCEL ID EIGHT TEN TWO FOUR ZERO TAC 100.

WE'LL GET THAT FOR YOU, SIR.

YES, SIR.

AGAIN, APPLICANT'S QUALITY ORAL COMPANY, LLC, 1311 REMEMBERING ROAD CURRENTLY DOWN THE C4 ASKING FOR C3 AS PARCEL, HISTORICALLY COMMERCIAL CURRENTLY IN OFFICE THAT PHOTOGRAPH OF THE PROPERTY HERE.

SEE THE SITE HERE ON GLEN BURNIE ROAD, EXISTING DOWNING C4 NEAR THE BUSINESS DENTRIX ESTABLISHED AS A DISTRICT IN WHICH THE PRINCIPAL USED SALINAS TO PROVIDE THE RETAILING OF GOODS AND SERVICES TO THE NEARBY RESIDENTS AND NEIGHBORHOODS LIKE THE NODS LIMIT BUSINESSES, WHICH MAY BE ESTABLISHED BUDDING RESIDENTIAL AREAS FOR C3.

THE CURRENT SOLUTIONS ESTABLISHED

[00:30:01]

AS ADDICTED FOR OPPOSITE FOR SOME SERVICES AND RETAIN ALL YOUR DURABLE CONVENIENCE GOODS GENERALLY BE LOCATED ON THE CITY MAJOR RADIO ROADS BECAUSE THESE DISTRICTS THEY'LL BE LOCATED ON HIGH VOLUME TRAFFIC ARTERIES AND WILL BE SUBJECT TO THE VIEW FROM TITLE ONLY LOCAL RESIDENTS BY TOURISTS AND OTHER NON LOCAL MURDERS, AMPLE FREE PARKING CONTROL, TRAFFIC MOVEMENT AND APPROPRIATE APPEARANCE, INCLUDING TWO.

UM, SO WHAT'S THE LAB AND SEE THREE SINGLE FAMILY, RESIDENTIAL MULTI-FAMILY RESIDENTIAL HIGH RETAIL, HIGH TRAFFIC, RETAIL RESTAURANTS, ADJACENT PROPERTY TO THE NORTH.

WE'VE GOT COMMERCIAL C4 BUSINESS, SOUTH COMMERCIAL AND RESIDENTIAL C5 OFFICE AND INDUSTRIAL DISTRICT.

I WOULD SAY RESIDENTIAL, RESIDENTIAL, OUR SIXTH AND LAST COMMERCIAL C4 OR REGIONAL LAND USE PLANS, AREA CLASSIFIED AS COMMERCIAL NEXT TO LAND USES INCLUDED IN THIS DESIGNATION.

RESIDENTIAL DENSITY RANGE FROM THE MAXIMUM OF ONE TO FIVE, ONE UNITS PER ACRE DENSITY IS COMMITTED.

REALLY A MULTI-FAMILY RESIDENTIAL PLANNING DEVELOPMENTS, COMMERCIAL AREAS.

IT TENDS TO BE BEHIND IT.

IT VARIES DEPENDING ON THE SPECIFIC OTHER LAND USE ORDINANCE.

ONLY THIS AREA IS CHARACTERIZED BY URBAN AND HIGHER INTENSITY USES THAT ARE URBAN AND PUBLIC SERVICES INCOMPATIBLE USES, BUT THIS LAND ACROSS THE VACATION OR INDUSTRIAL AGRICULTURE, ACCORDING TO RANDY'S PLAN AND SUBJECT PROPERTY TASK SUITABILITY FOR DEVELOPING THIS AREA, IT'S NOT IN THE FLOOD.

PLAIN IS CONSIDERED EXCELLENT MINIMAL FLOOD RISK.

THE PROPOSAL, THE REASON THE SUBJECT PROPERTY TO C3 VERSUS A DRINK IS CONSISTENT WITH THE CHARACTER OF JASON.

IS THERE ANY CLASSIFICATIONS THAT THE FAMILY OF THE PREDATORY GENDER TO BE IN THE PUBLIC INTEREST IN CONSISTENT WITH LAND USE AND TRANSPORTATION, FINANCE STAFF RECOMMENDED APPROVAL OF THE DYSLEXIC REPRESENTING THE APPLICATION HERE TONIGHT? DO I HAVE SOMEONE REPRESENTING QUALITY OIL COMPANY? YES.

YEAH.

MY NAME IS DANIEL DEZ GROUND AND QUALITY WHOLE COMPANY.

UM, UH, CURRENTLY OPERATING THEIR GAS BRANDS AND QUALITY MARKS HERE IN THE GENERAL VICINITY OF THIS AREA.

WE'D HAVE A GO GAS AND, UH, UH, SHOOT.

I REMEMBER THAT WHERE IT'S IT, UH, THAT OPENED LAST YEAR.

AND THEN IN LITTLE WASHINGTON WE HAVE, WHAT IS THE QUALITY PLUS BRAND THAT WE USE? IT IS A RETAIL FUEL, BUT A LITTLE BIT DIFFERENT IF YOU'VE EVER NOT EVER SEEN OUR STORES, WE DON'T HAVE INTERIOR RETAIL.

IT'S NOT LIKE A CONVENIENCE STORE WHERE YOU WALK IN YOU PARK OR ANYTHING LIKE THAT.

OURS IS BASED ON SPEED.

PEOPLE CAN GET THEIR GUYS GO TO A PAY WINDOW.

THEY WANT TO BUY OF APPROXIMATELY FIVE TO 10 PRODUCTS THAT YOU CAN HAND THROUGH A WINDOW.

IT'S A IT'S, IT'S GEARED FOR CONVENIENCE, UH, AND, AND NOT GETTING BEHIND PEOPLE.

YOU'RE BUYING LOTTERY TICKETS AND THINGS LIKE THAT.

AND HE SAID, IT'S A LITTLE BIT OF A DIFFERENT CONCEPT.

AND, UM, ONE THAT'S BEEN REALLY SUCCESSFUL.

WE'RE A FAMILY BUSINESS BEEN AROUND SINCE 1929 AND WE CURRENTLY HAVE AROUND 140 STORES, MOSTLY IN THE NORTH CAROLINA, EASTERN VIRGINIA, SOUTHERN VIRGINIA, EASTERN TENNESSEE, SOUTH CAROLINA.

OKAY.

YOU DON'T GO INSIDE.

IT'S A DRIVE THROUGH CONCEPT.

AND, UH, WE ARE, OUR MAIN PRODUCTS ARE TOBACCO PRODUCTS AND GASOLINE, AND THOSE ARE THE TWO MAIN PRODUCTS AND, UM, KIND OF AN ODD COMBINATION IN THIS WORLD SELLING THOSE TWO.

OBVIOUSLY THEY SELL THEM WELL, , WE'VE BEEN DOING IT FOR 93 YEARS AND IT IS, UH, IT'S ODDLY ENOUGH.

UH, IT'S, IT'S, UH, EXTREMELY CONVENIENT.

UH, SOME OF OUR BIGGEST CLIENTS ARE, UH, FEMALES WHO DON'T LIKE TO GO IN STORES WHERE THEY CAN

[00:35:01]

BUY CIGARETTES OR THEY'RE HIDING THAT THERE'S MAYBE THEIR HUSBAND OR THERE'S THE WEEKEND.

WE HAD A LOT OF GUYS DOING THAT TOO TOUGH AND ALL OF THAT.

SO, SO IT'S, UH, IT IS AN INTERESTING BUSINESS.

IT'S, IT'S, IT'S VERY, UH, EFFICIENT.

UH, WE DO A LOT OF WORK WITH MUNICIPALITIES OVERNIGHT FUELING FOR THEIR EMERGENCY SERVICES, TRUCKS, AND MOST OF THE COUNTIES, WE, UH, LOVE SMALLER, UH, COMMUNITIES.

UH, WINSTON IS A SMALLER COMMUNITY AND THAT'S WHERE WE'RE HEADQUARTERED WHERE NORTH CAROLINA COMPANY AND, UH, PROUD TO BE IN THIS AREA AND PROUD TO TRY TO GET INTO NEW ENGLAND.

WE'D LOVE TO BE HERE.

THANK YOU FOR BRIEF, SIR.

THIS ONE TIME, IS THERE ANYBODY FROM THE PUBLIC WHO WOULD LIKE TO ADDRESS ITEM E ON THE AGENDA AT THIS TIME? UH, I LIKE TO HEAR A MOTION FROM THE BOARD, LIKE TO MAKE A MOTION THAT WE RECOMMEND APPROVAL ON THE SENDING REQUESTS FOR PARCEL ID EIGHT DASH TWO 40 DASH 100 FROM C FOUR TO SECRET.

I HAVE A MOTION AND A SECOND E IS THAT WE GET A ROLL CALL, SIR? YES, YES, YES, YES, YES.

MOTION PASSES, ITEM

[2.F. Development Services are requesting consideration of two initial zoning designations for two parcels, that underwent annexation to the City of New Bern. Development Services are requesting an initial zoning designation of R-8 residential district for 3412 Old Airport Rd and 3436 Old Airport Rd.]

DEVELOPMENT SERVICES, OR REQUESTING CONSIDERATION OF TWO INITIALS ZONING DESIGNATION FOR TWO PARTNERS UNDERWENT ANNEXATION TO THE CITY OF NEWARK DEVELOPMENT SERVICES OR REQUESTING THEIR INITIAL ZONING DESIGNATION OF OUR EIGHT RESIDENTIAL DISTRICT OR 34 12 OLDER PORT ROAD AND 34 36 OLD AIRPORT ROAD.

MR. VICE CHAIR.

UM, JUST TO GIVE THE BOARD AN UPDATE.

THESE TWO PARCELS WERE ANNEXED TO THE CITY OF NEWBURGH IN THE LAST YEAR AND WHEN THE ANNEXATION BECAME EFFECTIVE, THERE WAS NOT A ZONING CLASSIFICATION AT THAT TIME, SINCE THEN, AS YOU KNOW, TYPES OF STAFFING CHANGES AND STAFF JUST WANTS TO MAKE SURE THAT ALL THE INTERESTS OF PERSONS THAT ARE IN CONTACT FOR THE CITIZENS BEFORE.

SO I THINK THERE'S BEEN A SUGGESTION THAT THIS POINT THAT YOU ALL TABLE THIS PARTICULAR ITEM INTO YOUR MAY MEETING, THAT WAY STAFF CAN JUST MAKE SURE THAT EVERYTHING IS BUTTONED UP FOR YOUR CONSIDERATION AT THAT TIME.

THANK YOU.

MA'AM UM, WITH THAT BEING SAID, CITY ATTORNEY DID THIS NAMING STAFF OVERVIEW.

SO DO YOU HAVE THAT DATE FOR THAT WHEN YOU PUT THAT SO I'LL HAPPILY MAKE A MOTION.

IT APPEARS THAT THE DATE OF THE MAIN MEETING IS MAY 3RD 21.

SO I WILL MAKE A MOTION THAT WE TABLE ITEM TWO F FROM, UH, THIS MONTH'S MEETING, UM, CONSIDERED THAT IS IDENTIFIED WITH INITIAL ZONING DESIGNATION PARCELS SEVEN DASH ONE FIVE DASH 0 1 7 IN PARCEL SEVEN DASH FIVE DASH 0 2 0.

AND POSTPONE THAT OR TABLE THAT TO OUR MAY 3RD, 20, 22 MINUTES.

I HAVE A MOTION.

DO I THE SECOND, NO SECOND MOTION.

AND A SECOND TO TABLE THAT TO MAY 3RD MEETING OR ITEM CHOCOLATE.

YES.

RIGHT? YES, YES, YES, YES.

[2.G. 2022 Land Use Plan Update]

AND LAST BUT NOT LEAST ITEM G 2022 LAND USE PLAN UPDATE.

YES, SIR.

OUR ACTING PLANNING DIRECTOR MAPS.

THIS WILL ACTUALLY BE PLAYING QUICK BECAUSE I HAVE VIRTUALLY NO INFORMATION ABOUT THIS AT THIS POINT, UH, WHEN HE WAS HERE IN VIDEO FORM, UH, AT THE LAST MEETING.

CORRECT.

AND, UH, YOU GUYS ESTABLISHED THE WORKING GROUP, UH, TO, UH, WORK WITH THEM.

I UNDERSTAND HE HASN'T CONTACTED YOU AT ALL.

NO, SIR.

UM, WHAT'S THAT IT'S DUE THE END OF END OF JUNE, BUT IT HAS TO COME TO YOU AND MAY, SO HE'S GOT ABOUT SEVEN WEEKS LEFT.

IT'S KIND OF ABOUT SEVEN WEEKS LEFT.

UM, SO, UM, REVIEWING THE CONTRACT, UH, CONTRACT DIDN'T SPECIFICALLY, UH, ADDRESS,

[00:40:02]

UH, THAT KIND OF WORKING GROUP RELATIONSHIP, BUT DID ADDRESS, UM, FOLLOW ON STAKEHOLDER OUTREACH BASED ON INDIVIDUALS AND GROUPS IDENTIFIED DURING THE KICKOFF MEETING.

UM, HOWEVER, THE KICKOFF MEETING WAS ACTUALLY A DIFFERENT MEETING THAN YOUR MEETING, SO, UM, YOU MAY STILL BE WITHIN HIS PURVIEW, UM, AS IT IS.

UM, BUT WE HAVE BEEN TRYING TO GET AHOLD OF HIM AND GET HIM TO TALK TO YOU.

I EVEN SPECIFICALLY ASKED HIM TO CALL HINGE OUT.

UM, SO WE'LL SEE, UM, LET'S STAY TUNED, I GUESS IS THE BEST I CAN SAY.

OKAY.

THANK YOU, MR. .

THANK YOU.

I WON'T HOLD MY BREATH ON THAT.

WE'LL SEE HOW THAT ALL RIGHT.

IS THERE ANYTHING ELSE FROM THE BOARD THAT WE NEED TO ADDRESS TONIGHT? I JUST HAVE ONE OTHER ITEM THROW IN ADDITIONAL, SO CHANGING COURSE, UM, JUST TO LET YOU KNOW ABOUT THE RESILIENCY PLAN, UM, AT SOME POINT WE WILL BE COMING TO YOU WITH, UH, A PRESENTATION TO GIVE YOU A BETTER UNDERSTANDING OF THE PLAN.

SO I JUST LOOK FORWARD TO BEING ABLE TO COME, MAYBE NOT THE NEXT MEETING AND MIGHT NOT BE READY QUITE FOR THAT, BUT PROBABLY THE FOLLOWING MEETING AFTER THAT SECOND MEETING, LOOKING FORWARD TO IT.

SO, ALL RIGHT.

UH, IS THERE ANYTHING ELSE FROM THE BOARD WE NEED TO ADDRESS TONIGHT? NO, SIR.

NO, SIR.

I HAVE A MOTION TO ADJOURN.

THE MEETING SET.

YES, YES, YES.